The timeline view lets you represent data in a chronological order.
Timeline views need 2 configuration fields:
dateStartField
(string, required)
The field key that should be used to get the start of the timeline activity. For example a section config like this:
{ "dateStartField": "Begin", "dateEndField": "End" }
Would expect each entry to have a Begin
and End
field with the begin/end dates.
Example data for this section config:
{ "lastUpdated": 1658756953, "sourceIdentifier": "tasks", "data": { "Begin": "2022-04-07", "Title": "Activate SSL-Certificates", "End": null }, "name": "Activate SSL-Certificates", "key": "POR-4" }, { "data": { "Begin": "2022-03-30", "Title": "Assign Roles", "End": "2022-04-04" }, "name": "Assign Roles", "key": "POR-1" },
Dates need to be supplied in the ISO 8601 format, YYYY-MM-DD. For example: 2022-04-07
dateEndField
(string, optional)
Same as the dateStartField
but for the end of the activity. If left blank, the activity will be considered a one-day event and be displayed as such.